
Hospitality · Hyderabad, India
Aureon Grand
A 240-key luxury hotel with banquet, spa and rooftop restaurant, delivered to an international operator's technical standards.
- Client
- Global Hospitality Operator
- Scope
- Design-Build, FF&E Coordination
- Built area
- 540,000 sq ft
- Project value
- ₹275 Cr
- Duration
- 28 months
- Status
- Completed · 2025
The Challenge
What made this difficult.
Operator brand standards required acoustic and finish tolerances well beyond regional norms, verified room by room.
Our Solution
How we solved it.
Two full mock-up rooms were built and tested twelve months before handover, locking every detail and eliminating rework across all 240 keys.
Gallery
The project in detail.
Construction Process
Method and sequence.
- 01
Mock-up room programme with acoustic verification
- 02
Dry-wall partitioning with resilient acoustic isolation
- 03
Stone facade with concealed mechanical fixing
- 04
Phased operator commissioning ahead of soft opening
Sustainability
Environmental performance.
- Heat recovery on all kitchen and laundry systems
- Greywater reuse for cooling towers
- LED-only lighting design
- Locally quarried stone within 200 km
Timeline
From award to handover.
01
Design
2022
02
Structure
2023
03
Fit-out
2024
04
Opening
2025
Planning something of this scale?
Tell us about your site, your programme and your ambition. Our directors respond to every enquiry personally.


