Industrial · Bengaluru, India
Nova Industrial Park
A 210-acre advanced manufacturing and logistics park with eleven pre-engineered halls, internal road networks and a dedicated 33kV substation.
- Client
- Nova Infratech
- Scope
- EPC, Utilities, Site Infrastructure
- Built area
- 4.2 million sq ft
- Project value
- ₹650 Cr
- Duration
- 30 months
- Status
- Under Construction · 2026
The Challenge
What made this difficult.
Eleven simultaneous buildings across undulating terrain required earthwork balance and a supply chain capable of 6,000 tonnes of steel per quarter.
Our Solution
How we solved it.
A cut-and-fill strategy achieved 96% on-site material balance, while a dedicated fabrication yard removed steel lead times from the critical path.
Gallery
The project in detail.
Construction Process
Method and sequence.
- 01
Mass earthworks with GPS-guided machine control
- 02
On-site steel fabrication yard with two erection fronts
- 03
Pre-engineered roof systems installed by mobile gantry
- 04
Parallel commissioning of the substation and utilities corridor
Sustainability
Environmental performance.
- 18 MW captive solar rooftop capacity
- Recycled aggregate in all internal roads
- Native species landscape buffer along the perimeter
- Smart metering across every hall
Timeline
From award to handover.
01
Earthworks
2024
02
Structures
2024 – 2025
03
Utilities
2025
04
Completion
2026