Nova Industrial Park in Bengaluru, India

Industrial · Bengaluru, India

Nova Industrial Park

A 210-acre advanced manufacturing and logistics park with eleven pre-engineered halls, internal road networks and a dedicated 33kV substation.

Client
Nova Infratech
Scope
EPC, Utilities, Site Infrastructure
Built area
4.2 million sq ft
Project value
₹650 Cr
Duration
30 months
Status
Under Construction · 2026

The Challenge

What made this difficult.

Eleven simultaneous buildings across undulating terrain required earthwork balance and a supply chain capable of 6,000 tonnes of steel per quarter.

Our Solution

How we solved it.

A cut-and-fill strategy achieved 96% on-site material balance, while a dedicated fabrication yard removed steel lead times from the critical path.

Gallery

The project in detail.

Construction Process

Method and sequence.

  1. 01

    Mass earthworks with GPS-guided machine control

  2. 02

    On-site steel fabrication yard with two erection fronts

  3. 03

    Pre-engineered roof systems installed by mobile gantry

  4. 04

    Parallel commissioning of the substation and utilities corridor

Sustainability

Environmental performance.

  • 18 MW captive solar rooftop capacity
  • Recycled aggregate in all internal roads
  • Native species landscape buffer along the perimeter
  • Smart metering across every hall

Timeline

From award to handover.

01

Earthworks

2024

02

Structures

2024 – 2025

03

Utilities

2025

04

Completion

2026