
Healthcare · Chennai, India
LifeCare Medical Centre
A 420-bed multi-speciality hospital with eight modular operating theatres, built around infection control and patient flow.
- Client
- LifeCare Health Group
- Scope
- Main Contract, Medical MEP
- Built area
- 620,000 sq ft
- Project value
- ₹190 Cr
- Duration
- 26 months
- Status
- Under Construction · 2026
The Challenge
What made this difficult.
Delivering theatre-grade air quality and redundancy while an adjacent existing clinic remained fully operational.
Our Solution
How we solved it.
Modular theatre pods were assembled off site and craned in overnight, with vibration and dust monitoring protecting the live clinical environment.
Gallery
The project in detail.
Construction Process
Method and sequence.
- 01
Vibration-monitored piling adjacent to live clinical areas
- 02
Off-site modular theatre pod fabrication
- 03
Medical gas manifold installation with full redundancy
- 04
Validated commissioning of clean-air systems
Sustainability
Environmental performance.
- Heat recovery ventilation across all wards
- Daylight autonomy in 70% of occupied areas
- Segregated clinical waste infrastructure
- Targeting IGBC Gold certification
Timeline
From award to handover.
01
Enabling
2024
02
Structure
2025
03
Services
2025 – 2026
04
Handover
2026
Planning something of this scale?
Tell us about your site, your programme and your ambition. Our directors respond to every enquiry personally.


